Start Date: 24-feb-05
Finish Date: 24-may-07
Client: Kermanshah Petrochemical Industries Company (KPIC)
Project's Type: PC
Project Description:
Construction, Installation, Pre-commissioning and Commissioning of:
- Gas Turbines (3 Sets) & Diesel Generators
- Water Treatment
- Heat Recovery Steam Generator (HRSG)
- Storage Tanks
- Auxiliary Boilers
- More than 280 cubicle of MV & LV Switchgears and Control Panels
- More than 530,000 m of MV, LV, I & C Cabling
- More than 40 Instrument Panel and 2200 Instrument Equipments
- Cooling Towers (8 Sets)
- Nitrogen and Oxygen Packages
- More than 3400 MT of Steel Structures
- Piping (more than 120,000 inch-diameter)
- Civil Works & Steel Structures (more than 3400 MT)
- Fire Detection and Fire Fighting Systems
- Lighting, Communications, Fire Detection & Fire Alarm Systems
![]() |